Choose the construction before counting parts
A self-weld fence and a panel fence create different work on site. State which construction is required before comparing rails, posts or connections. A self-weld request retains the need for site welding. A no-site-welding panel request still needs its specified joints, fixings and installation details; the name alone does not approve an anchorage.
Measure the requested fence runs and identify every change of direction and gate opening. A corner shared by two adjoining runs is one station with a corner role. A gate interrupts the fence rather than becoming a continuous rail through the opening. Separate physical runs remain separate so that their end posts are not accidentally merged.
Use the visual to check the supplied requirement
Check run lengths, height, rail count, corners and openings together in the dimensioned layout. Select only a supported height and rail combination. Unsupported slopes, animal containment or uncertain ground conditions need a retained review question. The model does not determine foundation depth, livestock suitability or structural adequacy.
Keep stock pieces, preparation, site welding and included connections distinct from optional installation accessories. An illustrative image shows a category style, not a completed Greatbridge project or an exact approved stock product. Price, availability and production details still require confirmation.
Have these details ready
- Construction: self-weld or no-site-welding panels
- Run dimensions, corners, gate positions and widths
- Specified height, rails, finish, fixing method and site questions
