Good planning brings the steel, site and installation team together. Earnie can organise your member details and missing information for a supply and installation quotation.
An enquiry for review. Scope, availability and price are confirmed for the individual project.
The stages to discuss with your project team
The installation method comes from the project design, site assessment and competent installation team. Bearing, connection, temporary-support and fire-protection details must come from that design.
Engineer’s drawings and calculations
Start with the structural engineer’s issued design: exact members, loads, supports, restraints and connections. Resolve missing details before the steel is made or the structure is altered.
Building-control requirements
Confirm the application route and required inspection stages with building control before structural work begins. Your project team must establish the regulations and guidance that apply to the building.
Site survey, access and lifting
Survey the existing structure and measure the route from delivery to the final position. Plan for installation height, services, overhead restrictions, ground conditions and the space needed for lifting equipment.
Designed temporary works and propping
Have temporary support and the work sequence designed and managed by competent people. Supports must be installed, checked, maintained and removed in accordance with that design.
Check the delivered steel
Check member marks, exact section, finished length, quantity, holes, plates, end cuts and finish against the confirmed specification. Hold and resolve any discrepancy before installation.
Bearings, plates and padstones
Prepare the support details specified by the engineer. Bearing lengths, plates, padstones and any specified grout are project decisions; confirm what is already arranged.
Safe lifting and positioning
Use a lift planned by a competent person, with suitable equipment, supervision and trained people. Control the working area and maintain the structure’s stability throughout positioning.
Connections exactly as designed
Complete connections to the issued design and specification. Missing bolt, weld, restraint or anchor information needs clarification from the designer before work proceeds.
Alignment and inspection
Check position, level, bearings, restraints and connections against the design. Keep inspection records and have discrepancies resolved before concealed work or subsequent loading.
Fire protection and making good
Install the fire-protection system required for this building and steelwork, following its specification. Coordinate making good, services and finishes with the agreed inspection stages.
Building-control inspection and handover
Arrange the required building-control inspections and provide the project’s completion records. Retain the drawings, steel specification and installation/fire-protection evidence for handover.
England guidance checked 13 October 2026. Your project adviser and building control must confirm the applicable edition and any transitional provisions. Other UK nations have their own building standards.
Supply and installation enquiry
Let Earnie bring the job details together.
Your configured steel stays attached. Add the missing site information so the project can be reviewed.
Demonstration enquiry No request is sent. Scope, availability, installation method, dates and price require review.