Organise what is on your drawing
Keep the issued drawing reference, revision and member marks beside the dimensions you enter. Live customer uploads and automatic drawing reading are unavailable. The drawing-status page explains that restriction; it does not accept a file or provide a live sample extraction service.
You can already type the steel and fabrication details you know. Earnie repeats those facts for confirmation and asks about missing information. Only supplied details are carried forward; unanswered dimensions stay as questions. Keep the full drawing mark and revision when organising the requirement.
Confirm facts before configuring steel
Use known section designations, finished lengths, quantities, holes, plates, cuts and finishes. Unsupported features and uncertainty stay under review. A customer confirmation does not approve structural design, release manufacturing or create a paid order. If the exact steel is already known, the direct selector remains available without the drawing demonstration.
Have these details ready
- Issued drawing references and controlling revision
- Known member marks and exact steel facts
- Questions and engineer details that still need confirmation
